15:47 10 Dec 25
Project:
2635 AMA08-W-23, Methane Recovery in Wastewater Treatment, Sarawak, Malaysia
- History
| Project | 2635: AMA08-W-23, Methane Recovery in Wastewater Treatment, Sarawak, Malaysia |
|---|---|
| Request for review |
Request 1
Request 2 Request 3 |
Data before corrections
| Amount of Reductions | 20,230 metric tonnes CO2 equivalent per annum |
|---|---|
| CDM-PDD |
project design document (329 KB)
PDD appendices Appendix 1 - Enclosure (838 KB)
Appendix 2 - Enclosure 1 (23 KB)
Appendix 3 - Enclosure 2 (11 KB)
Appendix 4 - Enclosure 3 (210 KB)
|
| Validation Report |
Validation report (507 KB)
|

project design document
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: