Project: 2621 Methane Recovery in Wastewater Treatment, Project AIN07-W-05, Sumatera Utara, Indonesia - History
Project 2621: Methane Recovery in Wastewater Treatment, Project AIN07-W-05, Sumatera Utara, Indonesia
Request for review Request 1
Request 2
Request 3

Data before corrections

Amount of Reductions 31,881 metric tonnes CO2 equivalent per annum
CDM-PDD project design document (318 KB)


PDD appendices
Appendix 1 - Enclosure (282 KB)
Appendix 2 - Enclosure 1 (11 KB)
Appendix 3 - Enclosure 2 (200 KB)
Appendix 4 - Enclosure 3 (44 KB)
Validation Report Validation report (736 KB)