Project: 2522 Yangxin Huaxin Cement 18MW Waste Heat Recovery as Power Project - History
Project 2522: Yangxin Huaxin Cement 18MW Waste Heat Recovery as Power Project
Request for review Request 1
Request 2
Request 3


EB meeting: EB53
(at which the Board considers the request(s) for review, decides whether to undertake the review and, if so, determine its scope and selects a review team)

Initial comments:
Joint Response (69 KB)
Enclosure (111 KB)
Enclosure 1 (127 KB)
Enclosure 2 (1038 KB)
Enclosure 3 (406 KB)
Enclosure 4 (1194 KB)
Enclosure 5 (1216 KB)
Enclosure 6 (168 KB)
Enclosure 7 (1596 KB)
Enclosure 8 (2529 KB)
Enclosure 9 (499 KB)
Enclosure 10 (1633 KB)
Enclosure 11 (125 KB)
Enclosure 12 (545 KB)
Enclosure 13 (265 KB)
Review Scope (131 KB)

EB meeting: EB55
(at which the report of the review team was/will be considered)

Data before corrections

Methodologies Used ACM0012 ver. 2 - Consolidated baseline methodology for GHG emission reductions for waste gas or waste heat or waste pressure based energy system”
CDM-PDD project design document (627 KB)
Validation Report Validation report (1090 KB)