15:34 25 Mar 23
Project
2511 :
The Waste Heat Recovery Based Coke Dry Quenching Power Generation Project of Xingang Company
| Project title |
The Waste Heat Recovery Based Coke Dry Quenching Power Generation Project of Xingang Company
- project design document (464 KB)
PDD appendices Appendix 1 - Enclosure (566 KB)
Appendix 2 - Enclosure 1 (83 KB)
Appendix 3 - Enclosure 2 (107 KB)
- registration request form (297 KB)
|
|---|---|
| SDC description report | Not Available. Please refer to our Further Information on SD-Tool |
| Host Parties |
China
, involved indirectly
approval (227 KB)
authorization (227 KB)
Authorized Participants: Xinyu Iron and Steel Co., Ltd. |
| Other Parties Involved |
United Kingdom of Great Britain and Northern Ireland
, involved indirectly
approval (140 KB)
authorization (140 KB)
Authorized Participants: Deutsche Bank AG, London Branch |
| Sectoral scopes |
1 : Energy industries (renewable - / non-renewable sources)
4 : Manufacturing industries |
| Activity Scale | LARGE |
| Methodologies Used |
ACM0012 ver. 2 -
Consolidated baseline methodology for GHG emission reductions for waste gas or waste heat or waste pressure based energy system”
|
| Standardized baselines used | N/A |
| Amount of Reductions | 127,597 metric tonnes CO2 equivalent per annum |
| Fee level | USD 24019.4 |
| Validation Report |
Validation report (994 KB)
Public availability information
Link to information uploaded for public availability |
| Modalities of Communication | |
| Registration Date | Withdrawn (view history) |
| Crediting Period | 01 Jul 09 - 30 Jun 19 (Fixed) |

project design document
Appendix 2 - Enclosure 1
Join the Climate Neutral Now initiative:
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: