06:09 05 Jan 25
Project
2508 :
Hebei Wasted Gas based Captive Power Plant Project in Longgang Group
Project title |
Hebei Wasted Gas based Captive Power Plant Project in Longgang Group
- project design document (998 KB) PDD appendices Appendix 1 - Enclosure (44 KB) Appendix 2 - Enclosure 1 (65 KB) Appendix 3 - Enclosure 2 (637 KB) Appendix 4 - Enclosure 3 (471 KB) Appendix 5 - Enclosure 4 (1741 KB) Appendix 6 - Enclosure 5 (20 KB) Appendix 7 - Enclosure 6 (423 KB) - registration request form (298 KB) |
---|---|
SDC description report | Not Available. Please refer to our Further Information on SD-Tool |
Host Parties |
China
, involved indirectly
approval (453 KB)
authorization (453 KB)
Authorized Participants: Xingtai Longhai Steel Group Co., Ltd. |
Other Parties Involved |
Japan
, involved indirectly
approval (590 KB)
authorization (590 KB)
Authorized Participants: PEAR Carbon Offset Initiative, Ltd. |
Sectoral scopes |
1 : Energy industries (renewable - / non-renewable sources)
4 : Manufacturing industries |
Activity Scale | LARGE |
Methodologies Used |
ACM0012 ver. 2 -
Consolidated baseline methodology for GHG emission reductions for waste gas or waste heat or waste pressure based energy system”
|
Standardized baselines used | N/A |
Amount of Reductions | 202,103 metric tonnes CO2 equivalent per annum |
Fee level | USD 38920.6 |
Validation Report |
Validation report (1050 KB)
Public availability information
Link to information uploaded for public availability |
Modalities of Communication | |
Registration Date | Withdrawn (view history) |
Crediting Period | 01 Jul 09 - 30 Jun 19 (Fixed) |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: