09:57 21 Apr 25
Registration Request for Review Form
CDM project activity/programme of activities registration request review form (CDM-REGR-FORM) (Version 03.0) |
---|
Reference number of the proposed CDM project activity/programme of activities (PoA) submitted for registration | 2508 |
---|---|
Title of the proposed CDM project activity/PoA submitted for registration | Hebei Wasted Gas based Captive Power Plant Project in Longgang Group |
Please indicate, in accordance with paragraphs 37 and 40 of the CDM modalities and procedures, which validation requirement(s) may require review. A list of requirements is provided below. Please provide reasons in support of the request for review. Including any supporting documentation. | |
The following are requirements derived from paragraph 37 of the CDM modalities and procedures: | |
![]() ![]() ![]() ![]() ![]() ![]() ![]() |
|
The following are requirements derived from paragraph 40 of the CDM modalities and procedures: | |
![]() ![]() ![]() ![]() ![]() ![]() |
|
![]() |
|
Additional information | |
1. The DOE shall further substantiate the existence of investment and technological barrier in accordance with the Sub-step 3a of the Tool for the demonstration and assessment of additionality, version 05.2. 2. The PP/DOE shall further substantiate: (i) that the waste gas/pressure utilized in the project activity was released into the atmosphere in the absence of the project activity at existing facility with detailed information in line with the applicability criteria of the methodology, and (ii) how it is confirmed that the electricity was purchased from the imports from the North China Power Grid in the pre-project scenario. 3. The PP/DOE shall provide the detailed information of BFG and LDG generation from each unit in the pre-project scenario/project scenario and quantity of BFG and LDG utilized in the project activity from each unit. 4. The PP/DOE shall substantiate how the treatment of the installation of new blast furnace and new gas converter is in line with the applicability criteria of the methodology. 5. The means of calculation of fcap for waste gas fired power plants and fcap for waste pressure based power plants are not in line with ACM0012 v2. The DOE shall clarify why Corrective Action Requests were not raised during validation. 6. The monitoring plan shall include monitoring of: (i) quantity of waste gas used for energy generation (Q WG,h), (ii) amount of individual fuel (Qi,h) consumed at the energy generation unit, and (iii) net calorific values of the waste gas (NCV WG) and fossil fuel (NCVi) used in the project activity in accordance with the methodology. |
|
Date | 30 Jul 09 |