12:35 24 Oct 25
Project
2499 :
Jiangxi Pinggang Group 20MW Waste Gas and Surplus Steam based Captive Power Plant
| Project title |
Jiangxi Pinggang Group 20MW Waste Gas and Surplus Steam based Captive Power Plant
- project design document (746 KB)
PDD appendices Appendix 1 - Enclosure (139 KB)
Appendix 2 - Enclosure 1 (155 KB)
Appendix 3 - Enclosure 2 (868 KB)
Appendix 4 - Enclosure 3 (232 KB)
Appendix 5 - Enclosure 4 (754 KB)
Appendix 6 - Enclosure 5 (128 KB)
- registration request form (297 KB)
|
|---|---|
| SDC description report | Not Available. Please refer to our Further Information on SD-Tool |
| Host Parties |
China
, involved indirectly
approval (189 KB)
authorization (189 KB)
Authorized Participants: Pingxiang Iron and Steel Group Co., Ltd. |
| Other Parties Involved |
Japan
, involved indirectly
approval (341 KB)
authorization (341 KB)
Authorized Participants: The Tokyo Electric Power Company, Incorporated |
| Sectoral scopes |
1 : Energy industries (renewable - / non-renewable sources)
4 : Manufacturing industries |
| Activity Scale | LARGE |
| Methodologies Used |
ACM0012 ver. 2 -
Consolidated baseline methodology for GHG emission reductions for waste gas or waste heat or waste pressure based energy system”
|
| Standardized baselines used | N/A |
| Amount of Reductions | 103,368 metric tonnes CO2 equivalent per annum |
| Fee level | USD 19173.6 |
| Validation Report |
Validation report (2258 KB)
Public availability information
Link to information uploaded for public availability |
| Modalities of Communication | |
| Registration Date | Withdrawn (view history) |
| Crediting Period | 01 Jul 09 - 30 Jun 19 (Fixed) |

project design document
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: