Registration Request for Review Form
CDM project activity/programme of activities registration request review form (CDM-REGR-FORM) (Version 03.0) |
---|
Reference number of the proposed CDM project activity/programme of activities (PoA) submitted for registration | 2176 |
---|---|
Title of the proposed CDM project activity/PoA submitted for registration | China Changtanghe Rundle Small Hydropower Project |
Please indicate, in accordance with paragraphs 37 and 40 of the CDM modalities and procedures, which validation requirement(s) may require review. A list of requirements is provided below. Please provide reasons in support of the request for review. Including any supporting documentation. | |
The following are requirements derived from paragraph 37 of the CDM modalities and procedures: | |
![]() ![]() ![]() ![]() ![]() ![]() ![]() |
|
The following are requirements derived from paragraph 40 of the CDM modalities and procedures: | |
![]() ![]() ![]() ![]() ![]() ![]() |
|
![]() |
|
Additional information | |
1. The PP should provide separate IRR calculations for each of the three components of the project activity as per paragraph 6 of the guidance for completing the PDD for small-scale activities (version 5). 2. The PP/DOE should clarify the response made to CAR 5 (VR, p51): ‘ the date of FSR approval of the three hydropower stations is the same, but the dates of PDR approval of three stages hydropower stations is different separately’, as it is not clear how the PDR was approved separately for each plant. 3. The DOE is requested to clarify how it has validated that the difference between the annual designed maximum power generation (51,280 MWh) and annual on-grid electricity supply (41,024MWh) is appropriate in the context of the underlying project activity. 4. The PP should specify the monitoring details (PDD, section B.7.1) for each of the three hydropower components as per paragraph 6 of the guidance for completing the PDD for small-scale activities (version 5). 5. The DOE should validate if there are more hydropower stations connected to the project sub-station. |
|
Date | 15 Apr 09 |