10:53 28 May 26
Project:
2096 Fujian Pingnan Houlongxi 48MW Hydropower Project
- History
| Project | 2096: Fujian Pingnan Houlongxi 48MW Hydropower Project |
|---|
Data before approval of the request for post-registration changes on 02 Apr 2013
| Link to PRC form | PRC |
|---|---|
| CDM-PDD |
project design document (722 KB)
PDD appendices Appendix 1 - Revised PDD_Tracked (738 KB)
Appendix 2 - Revised IRR calculation (133 KB)
|
| Validation opinion on changes in PDD |
Validation opinion on changes in PDD (39 KB)
|
Data before acceptance of changes in PDD on 28 Jan 2011
| CDM-PDD |
project design document (786 KB)
PDD appendices Appendix 1 - Enclosure (298 KB)
Appendix 2 - Enclosure 1 (241 KB)
Appendix 3 - Enclosure 2 (117 KB)
|
|---|

project design document
Appendix 2 - Revised IRR calculation
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: