Project: 2096 Fujian Pingnan Houlongxi 48MW Hydropower Project - History
Project 2096: Fujian Pingnan Houlongxi 48MW Hydropower Project

Data before approval of the request for post-registration changes on 02 Apr 2013

Link to PRC form PRC
CDM-PDD project design document (722 KB)


PDD appendices
Appendix 1 - Revised PDD_Tracked (738 KB)
Appendix 2 - Revised IRR calculation (133 KB)

Validation opinion on changes in PDD Validation opinion on changes in PDD (39 KB)

Data before acceptance of changes in PDD on 28 Jan 2011

CDM-PDD project design document (786 KB)


PDD appendices
Appendix 1 - Enclosure (298 KB)
Appendix 2 - Enclosure 1 (241 KB)
Appendix 3 - Enclosure 2 (117 KB)