07:59 13 Sep 26
Project:
2065 Guizhou Xingyi Laojiangdi Hydropower Station
- Crediting Period Renewal Request
[]
| Project |
2065: Guizhou Xingyi Laojiangdi Hydropower Station
- project design document (557 KB)
PDD appendices Appendix 1 - ER calculation (29 KB)
- crediting period renewal form (40 KB)
|
|---|---|
| Methodologies Used |
ACM0002 ver. 16 -
Grid-connected electricity generation from renewable sources
|
| VVS Version | VVS 9.0 |
| Standardized baselines used | N/A |
| Amount of Reductions | 220,221 metric tonnes CO2 equivalent per annum |
| Validation Opinion |
Validation opinion (420 KB)
|
| Renewal Date |
12 Aug 16
(Renewable - Expired)
(view history)
completeness check: complete
info & rep check: concluded
Renewal no longer possible
|
| Crediting Period (requested for renewal) |
20 Apr 16 - 19 Apr 23
Other crediting period(s): 20 Apr 09 - 19 Apr 16 |
| Requests for Issuance
and related documentation |
|

project design document
Appendix 1 - ER calculation
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: