Project: 2065 Guizhou Xingyi Laojiangdi Hydropower Station - Crediting Period Renewal Request
[]
Project 2065: Guizhou Xingyi Laojiangdi Hydropower Station

- project design document (557 KB)

PDD appendices
Appendix 1 - ER calculation (29 KB)

- crediting period renewal form (40 KB)
Methodologies Used ACM0002 ver. 16 - Grid-connected electricity generation from renewable sources
VVS Version VVS 9.0
Standardized baselines used N/A
Amount of Reductions 220,221 metric tonnes CO2 equivalent per annum
Validation Opinion Validation opinion (420 KB)
Renewal Date 12 Aug 16 (Renewable - Expired)   (view history)   completeness check: complete info & rep check: concluded
Renewal no longer possible
Crediting Period (requested for renewal) 20 Apr 16 - 19 Apr 23

Other crediting period(s): 20 Apr 09 - 19 Apr 16
Requests for Issuance
and related documentation