17:50 29 Nov 26
Project:
2017 Hubei Lichuan Longqiao Hydropower Station
- Crediting Period Renewal Request
[]
| Project |
2017: Hubei Lichuan Longqiao Hydropower Station
- project design document (647 KB)
PDD appendices Appendix 1 - ER Calculation for Longqiao CP Renew (71 KB)
- crediting period renewal form (40 KB)
|
|---|---|
| Methodologies Used |
ACM0002 ver. 16 -
Grid-connected electricity generation from renewable sources
|
| VVS Version | VVS 9.0 |
| Standardized baselines used | N/A |
| Amount of Reductions | 100,538 metric tonnes CO2 equivalent per annum |
| Validation Opinion |
Validation opinion (436 KB)
|
| Renewal Date |
19 Aug 16
(Renewable - Expired)
(view history)
completeness check: complete
info & rep check: concluded
Renewal no longer possible
|
| Crediting Period (requested for renewal) |
23 Jan 16 - 22 Jan 23
Other crediting period(s): 23 Jan 09 - 22 Jan 16 |
| Requests for Issuance
and related documentation |
|

project design document
Appendix 1 - ER Calculation for Longqiao CP Renew
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: