22:22 21 Jan 26
Project
1969 :
Sichuan Shimian Xieluo Wanba River Hydropower Station
| Project title |
Sichuan Shimian Xieluo Wanba River Hydropower Station
- project design document (488 KB)
PDD appendices Appendix 1 - Enclosure 1 (576 KB)
Appendix 2 - Enclosure 2 (142 KB)
Appendix 3 - Enclosure 3 (1707 KB)
Appendix 4 - Enclosure 4 (156 KB)
Appendix 5 - Enclosure 5 (12 KB)
Appendix 6 - Enclosure 6 (342 KB)
Appendix 7 - Enclosure 7 (345 KB)
- registration request form (242 KB)
|
|---|---|
| SDC description report | Not Available. Please refer to our Further Information on SD-Tool |
| Host Parties |
China
, involved indirectly
approval (165 KB)
authorization (165 KB)
Authorized Participants: Sichuan Liyuan Electricity Development Co., Ltd |
| Other Parties Involved |
Italy
, involved indirectly
approval (2694 KB)
authorization (2694 KB)
Authorized Participants: Edison Spa |
| Sectoral scopes | 1 : Energy industries (renewable - / non-renewable sources) |
| Activity Scale | LARGE |
| Methodologies Used |
ACM0002 ver. 6 -
Consolidated methodology for grid-connected electricity generation from renewable sources
|
| Standardized baselines used | N/A |
| Amount of Reductions | 233,792 metric tonnes CO2 equivalent per annum |
| Fee level | USD 45258.4 |
| Validation Report |
Validation report (1225 KB)
Public availability information
Link to information uploaded for public availability |
| Modalities of Communication | |
| Registration Date | Rejected (view history) |
| Crediting Period | 01 Nov 08 - 31 Oct 15 (Renewable) |

project design document
Appendix 6 - Enclosure 6
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: