Project 1956 : Xinjiang Uygur Autonomous Region Tekesi River Shankou Hydropower Station
Project title Xinjiang Uygur Autonomous Region Tekesi River Shankou Hydropower Station
- project design document (683 KB)

PDD appendices
Appendix 1 - Enclosure (482 KB)
Appendix 2 - Enclosure 1 (9454 bytes)
Appendix 3 - Enclosure 2 (364 KB)
Appendix 4 - Enclosure 3 (7756 bytes)
Appendix 5 - Enclosure 4 (272 KB)
Appendix 6 - Enclosure 5 (10 KB)
Appendix 7 - Enclosure 6 (655 KB)
Appendix 8 - Enclosure 7 (346 KB)
Appendix 9 - Enclosure 8 (355 KB)


- revised monitoring plan (116 KB) (Approved: 06 Apr 12)
- validation report of revised monitoring plan (208 KB)

- registration request form (234 KB)
SDC description report Not Available. Please refer to our Further Information on SD-Tool
Host Parties China , involved indirectly approval (141 KB) authorization (141 KB)
Authorized Participants: Xinjiang Ili River Basin Development and Construction Management Centre
Other Parties Involved Netherlands , involved indirectly approval (74 KB) authorization (74 KB)
Authorized Participants: ENEL Trade S.p.A. (withdrawn)
Sectoral scopes 1 : Energy industries (renewable - / non-renewable sources)
Activity Scale LARGE
Methodologies Used ACM0002 ver. 6 - Consolidated methodology for grid-connected electricity generation from renewable sources
Standardized baselines used N/A
Amount of Reductions 471,637 metric tonnes CO2 equivalent per annum
Fee level USD 92827.4
Validation Report Validation report (1042 KB) Public availability information
Link to information uploaded for public availability
Modalities of Communication
MoC Annex 1
Modalities of Communication valid as of 02/03/2016
MoC Annex 2 (Change/update authorized signatory, name or contact details) valid as of 02/03/2016
MoC Annex 2 (Withdraw Project Participant) valid as of 02/03/2016
MoC Annex 2 (Change/update authorized signatory, name or contact details) valid as of 03/02/2014
MoC Annex 2 (Change/update authorized signatory, name or contact details) valid as of 17/08/2010
Registration Date 29 Mar 09   (view history)  
Crediting Period 12 Aug 10 - 11 Aug 17 (Renewable - Expired)
Changed from: 29 Mar 09 - 28 Mar 16
Renewal no longer possible
Requests for Issuance
and related documentation

Monitoring report: 12 Aug 2010 - 27 May 2011 (366 KB)
Issuance request state: Issued
CERs requested up to 31 December 2012: 343578
Serial Range: Block start: CN-5-469148684-1-1-0-1956      Block end: CN-5-469492261-1-1-0-1956
[Full view and history]



Monitoring report: 28 May 2011 - 27 Jun 2012 (442 KB)
Issuance request state: Issued
CERs requested up to 31 December 2012: 662250
Serial Range: Block start: CN-5-728762151-1-1-0-1956      Block end: CN-5-729424400-1-1-0-1956
[Full view and history]