02:48 20 Aug 25
Project
1941 :
Langxiang 30MW Hydro Power Project in Guizhou Province China
| Project title |
Langxiang 30MW Hydro Power Project in Guizhou Province China
- project design document (659 KB)
PDD appendices Appendix 1 - Enclosure (193 KB)
Appendix 2 - Enclosure 1 (41 KB)
Appendix 3 - Enclosure 2 (333 KB)
Appendix 4 - Enclosure 3 (860 KB)
Appendix 5 - Enclosure 4 (1429 KB)
- registration request form (235 KB)
|
|---|---|
| SDC description report | Not Available. Please refer to our Further Information on SD-Tool |
| Host Parties |
China
, involved indirectly
approval (910 KB)
authorization (910 KB)
Authorized Participants: Libo Lidu Hydro Power Development Co.Ltd. |
| Other Parties Involved |
Japan
, involved indirectly
approval (36 KB)
authorization (36 KB)
Authorized Participants: Eco Asset Inc. |
| Sectoral scopes | 1 : Energy industries (renewable - / non-renewable sources) |
| Activity Scale | LARGE |
| Methodologies Used |
ACM0002 ver. 6 -
Consolidated methodology for grid-connected electricity generation from renewable sources
|
| Standardized baselines used | N/A |
| Amount of Reductions | 99,566 metric tonnes CO2 equivalent per annum |
| Fee level | USD 18413.2 |
| Validation Report |
Validation report (521 KB)
Public availability information
Link to information uploaded for public availability |
| Modalities of Communication | |
| Registration Date | Withdrawn (view history) |
| Crediting Period | 15 Sep 08 - 14 Sep 15 (Renewable) |

project design document
Appendix 2 - Enclosure 1
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: