Issuance Request for Review Form


CDM project activity/programme of activities
issuance request review form (CDM-ISSR-FORM)
(Version 03.0)

Project title of the project activity or programme of activities (PoA) for which issuance is requestedDuerping Coal Mine Methane Utilization Project (1900)
DOE that requested for issuance and date of requestSGS (01 Feb 10)
Please indicate, in accordance with paragraphs 65 of the CDM modalities and procedures, for which reason(s) you request review
Incompetence
Please indicate reasons for the request for review
1. The DOE shall clarify how the project monitoring has complied with the methodology with regard to the parameters “B14” (pre-mining CMM captured, sent to and destroyed) and “B16” (post-mining CMM captured, sent to and destroyed).

OTHER ISSUES

2. Further clarification is required on a) why generation data was available from March 2009 onwards while the PP states that the operation started in May 2009 (page 3 of monitoring report); b) the conversion between measured gas volume flow into normalized flow rates, since the PP reported the values only in m3/month times methane density at normal conditions (Nm3).
Date 07 May 10