18:17 24 Nov 24
Issuance Request for Review Form
CDM project activity/programme of activities issuance request review form (CDM-ISSR-FORM) (Version 03.0) |
---|
Project title of the project activity or programme of activities (PoA) for which issuance is requested | Methane Recovery in Wastewater Treatment, Project AIN07-W-01, Sumatera Utara (North Sumatera), Indonesia (1899) |
---|---|
DOE that requested for issuance and date of request | SIRIM (19 Feb 11) |
Please indicate, in accordance with paragraphs 65 of the CDM modalities and procedures, for which reason(s) you request review | |
Incompetence | |
Please indicate reasons for the request for review | |
1) The DOE should further verify if the project emissions from electricity consumption have been calculated in line with the requirements of AMS-I.D, version 13, as indicated in the monitoring report. The diesel emission factor used in the calculations is 0.8 kgCO2/kWh, however, as per this methodology, the default emission factor depends on the installed capacity, and the corresponding emission factor for the installed capacity of the diesel unit (21 kW) indicated in the spreadsheet is 1.1 kgCO2/kWh . Please refer to AMS.I-D version 13, Table I.D.1. |
|
Date | 24 May 12 |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: