11:22 03 Nov 25
Project:
1857 Hunan Yuanshui Qingshuitang Hydropower Station
- Crediting Period Renewal Request
[]
| Project |
1857: Hunan Yuanshui Qingshuitang Hydropower Station
- project design document (1388 KB)
PDD appendices Appendix 1 - ER calculation sheet (72 KB)
- crediting period renewal form (24 KB)
|
|---|---|
| Methodologies Used |
ACM0002 ver. 16 -
Grid-connected electricity generation from renewable sources
|
| VVS Version | VVS 9.0 |
| Standardized baselines used | N/A |
| Amount of Reductions | 285,364 metric tonnes CO2 equivalent per annum |
| Validation Opinion |
Validation opinion (183 KB)
|
| Renewal Date |
21 Nov 15
(Renewable - Expired)
(view history)
completeness check: complete
info & rep check: concluded
Renewal no longer possible
|
| Crediting Period (requested for renewal) |
04 Nov 15 - 03 Nov 22
Other crediting period(s): 04 Nov 08 - 03 Nov 15 |
| Requests for Issuance
and related documentation |
|

project design document
Appendix 1 - ER calculation sheet
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: