Project title of the project activity or programme of activities (PoA) for which issuance is requested | Waste Heat Recovery and Utilisation for Power Generation Project of Zongyang Conch Cement Company Limited (1676) |
---|---|
DOE that requested for issuance and date of request | DNV (22 Dec 09) |
Please indicate, in accordance with paragraphs 65 of the CDM modalities and procedures, for which reason(s) you request review | |
Incompetence | |
Please indicate reasons for the request for review | |
The DOE (p 10) states that In order to account for any possible uncertainty resulting from the lower accuracy of the auxiliary meters, the data from backup monitoring system have been used to calculate the emission reductions for the monitoring period from 13 February 2009 to 15 June 2009.
.. Comparing the meter reading from the main meters and backup meters, in addition to higher data accuracy, the data from back-up meters are more conservative. However, according to the spreadsheet submitted, the meter readings from the main meters of the 2nd phase project activity for the period of April - June 2009 is more conservative than the meter readings from the backup meter. Further clarification is required on how the DOE verified: 1) The backup meter readings which consisted of EGExport and EGImport as per the applied methodology; and 2) That choosing backup meter readings for the calculation of the emission reduction was more conservative. |
|
Date | 12 Mar 10 |