17:34 23 Nov 24
Issuance Request for Review Form
CDM project activity/programme of activities issuance request review form (CDM-ISSR-FORM) (Version 03.0) |
---|
Project title of the project activity or programme of activities (PoA) for which issuance is requested | Methane Recovery in Wastewater Treatment, Project AMA07-W-01, Perak, Malaysia (1616) |
---|---|
DOE that requested for issuance and date of request | SIRIM (06 Sep 10) |
Please indicate, in accordance with paragraphs 65 of the CDM modalities and procedures, for which reason(s) you request review | |
Incompetence | |
Please indicate reasons for the request for review | |
The variability of the methane content established by sampling during the monitoring period ranges from 32.00% to 77.50% and the measured variation has not been taken into account when the sample size was determined. Hence, it is not clear whether the sampled parameter can meet the 95% confidence level as required by paragraph 11 of the AMS-III.H, ver.05. The DOE is requested to clarify how it was verified that the sampling of the methane content conducted during the monitoring period complies with the requirement to undertake periodical measurement of the parameter at a 95% confidence level. |
|
Date | 11 Jan 11 |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: