17:16 01 Feb 26
Project:
1482 Conversion of existing open cycle gas turbine to combined cycle at the Central Termica Patagonia power station, Comodoro Rivadavia, Argentina
- Issuance Request
| Project | 1482: Conversion of existing open cycle gas turbine to combined cycle at the Central Termica Patagonia power station, Comodoro Rivadavia, Argentina |
|---|---|
| ISSUANCE STATUS | Issued (on 15 Jul 13) completeness check: complete | info & rep check: concluded |
| Monitoring period | 01 Jun 12 - 31 Dec 12 |
| Monitoring report |
Monitoring report (645 KB)
|
| Request for issuance |
Signed form (52 KB)
|
| Amount of CERs |
CERs issued up to 31 December 2012:
47,544
Serial Range:
Block start: AR-5-14216431-1-1-0-1482
Block end: AR-5-14263974-1-1-0-1482
|
| Verification and certification reports |
VVS/VVM version:
VVS 3.0
Certification report (1340 KB)
Verification report (1340 KB)
|
| Additional documents |
Ref. 9e - Monitoring Report Comodoro 4th verification v2.3_220413 (658 KB)
Ref. 19e - File 1-CER Spreadsheet Jun -Dec 2012 v4 22.04.2013 (81 KB)
Ref. 15b - Partial Calculation 1of2 (25 MB)
Ref. 16b - Partial Calculation 2of2 (21 MB)
|

Monitoring report
Ref. 19e - File 1-CER Spreadsheet Jun -Dec 2012 v4 22.04.2013