22:20 03 May 24
Issuance Request for Review Form
CDM project activity/programme of activities issuance request review form (CDM-ISSR-FORM) (Version 03.0) |
---|
Project title of the project activity or programme of activities (PoA) for which issuance is requested | Jinxiang – Golden Elephant Line 1 N2O Abatement Project (1455) |
---|---|
DOE that requested for issuance and date of request | DNV (28 Nov 08) |
Please indicate, in accordance with paragraphs 65 of the CDM modalities and procedures, for which reason(s) you request review | |
Incompetence | |
Please indicate reasons for the request for review | |
Further clarification is required on how: 1. The methodological requirement on EN14181 has been followed with respect to QAL1 as the certificate was issued by the equipment supplier rather than an accredited testing entity. 2. Baseline N2O emission factor was correctly calculated since the spreadsheet shows a total nitric acid production of 94,095 tones instead of the reported 71,888 tones during the baseline campaign. Other Issue: 3. The verification report (p.10) contains a statement on the design capacity, in which it calculates the cap based on the design capacity (daily) times 365 days a year, while the PDD (p.3) states that the design operating time is 330 days a year. Further clarification is required. |
|
Date | 06 Mar 09 |