Issuance Request for Review Form


CDM project activity/programme of activities
issuance request review form (CDM-ISSR-FORM)
(Version 03.0)

Project title of the project activity or programme of activities (PoA) for which issuance is requestedJinxiang – Golden Elephant Line 1 N2O Abatement Project (1455)
DOE that requested for issuance and date of requestDNV (20 Aug 09)
Please indicate, in accordance with paragraphs 65 of the CDM modalities and procedures, for which reason(s) you request review
Incompetence
Please indicate reasons for the request for review
1. Further clarification is required on how the DOE verified the Operating Hours (OH) for calculating the baseline emission factor, considering that the methodology requires that N2O values measured beyond the CLnormal operating hours should be eliminated.

Other Issues
2. The Verification Report (end of p.19) refers to CAR1 when describing the correction on the highest value measured during AMS down times in the project campaign. However, CAR1 covers QAL1 related issue only. Clarification is required.

3. The Verification report (p.20) states that the UNC used is 6.0% while the monitoring report (p.10 of 11) states an “UNC combined” figure as 5.99%. Clarification is required.
Date 12 Nov 09