Project 1375 : Shandong Gaotang 30MW Biomass Power Generation Project
Project title Shandong Gaotang 30MW Biomass Power Generation Project
- project design document (868 KB) (accepted - 02 Mar 2012 - - view previous)

PDD appendices
Appendix 1 - Revised PDD Tracked Changes (574 KB)
Appendix 2 - Notification (51 KB)
Appendix 3 - Validation Opinion Tracked Changes (758 KB)
Appendix 4 - IRR comparison and Emission Reduction Calculation Spreadsheet (127 KB)


- registration request form (108 KB)
SDC description report Not Available. Please refer to our Further Information on SD-Tool
Host Parties China , involved indirectly approval (75 KB) authorization (75 KB)
Authorized Participants: National Bio Energy Co., Ltd.
Other Parties Involved United Kingdom of Great Britain and Northern Ireland , involved indirectly approval (30 KB) authorization (30 KB)
Authorized Participants: EDF Trading Limited (withdrawn as of 09/12/2021)
Germany , involved indirectly approval (914 KB) authorization (914 KB)
Authorized Participants: UPM Umwelt-Projekt-Management GmbH
Sectoral scopes 1 : Energy industries (renewable - / non-renewable sources)
Activity Scale LARGE
Methodologies Used ACM0006 ver. 4 - Consolidated methodology for grid-connected electricity generation from biomass residues
Standardized baselines used N/A
Amount of Reductions 140,695 metric tonnes CO2 equivalent per annum
The requests for issuance are allowed under the condition that the annual amount of CERs to be issued to the project activity shall be capped at the average annual emissions estimated in the original registered PDD.
Fee level USD 26639.0
Validation Report Validation report (538 KB) Public availability information
Link to information uploaded for public availability

Validation opinion on changes in PDD (615 KB)
Modalities of Communication
Modalities of Communication valid as of 10/12/2021
MoC Annex 2 (Add Project Participant) valid as of 14/06/2022
MoC Annex 2 (Withdraw Project Participant (Voluntary)) valid as of 09/12/2021
MoC Annex 2 (Change/update authorized signatory, name or contact details) valid as of 09/11/2021
MoC Annex 2 (Change/update authorized signatory, name or contact details) valid as of 10/06/2016
MoC Annex 2 (Change/update authorized signatory, name or contact details) valid as of 24/03/2014
MoC Annex 2 (Change/update authorized signatory, name or contact details) valid as of 11/02/2010
Registration Date 20 Mar 08   (view history)  
Crediting Period 20 Mar 08 - 19 Mar 15 (Renewable)

Subsequent crediting period(s): 20 Mar 15 - 19 Mar 22
Requests for Issuance
and related documentation

Monitoring report: 20 Mar 2008 - 25 Mar 2009 (296 KB)
Issuance request state: Issued
CERs requested up to 31 December 2012: 143007
Serial Range: Block start: CN-5-671172478-1-1-0-1375      Block end: CN-5-671315484-1-1-0-1375
[Full view and history]



Monitoring report: 26 Mar 2009 - 25 Dec 2012 (425 KB)
Issuance request state: Issued
CERs requested up to 31 December 2012: 528473
Serial Range: Block start: CN-5-891713340-1-1-0-1375      Block end: CN-5-892241812-1-1-0-1375
[Full view and history]



Monitoring report: 26 Dec 2012 - 19 Mar 2015 (1093 KB)
Issuance request state: Issued
CERs requested up to 31 December 2012: 2313
CERs requested from 01 Jan 2013 until 31 December 2020: 311456
Serial Range: Block start: CN-5-975507343-1-1-0-1375      Block end: CN-5-975509655-1-1-0-1375
Serial Range: Block start: CN-5-975509656-2-2-0-1375      Block end: CN-5-975821111-2-2-0-1375
[Full view and history]