Project:
1373 Beijing No.3 Thermal Power Plant Gas-Steam Combined Cycle Project Using Natural Gas
- Crediting Period Renewal Request
[]
| Project |
1373: Beijing No.3 Thermal Power Plant Gas-Steam Combined Cycle Project Using Natural Gas
- project design document (1037 KB)
PDD appendices Appendix 1 - ER sheet (41 KB)
- crediting period renewal form (1246 KB)
|
|---|---|
| Methodologies Used |
AM0029 ver. 3 -
Baseline Methodology for Grid Connected Electricity Generation Plants using Natural Gas
|
| VVS Version | |
| Standardized baselines used | N/A |
| Amount of Reductions | 260,424 metric tonnes CO2 equivalent per annum |
| Validation Opinion |
Validation opinion (288 KB)
|
| Renewal Date |
13 Mar 15
(Renewable - Expired)
(view history)
Renewal no longer possible
|
| Crediting Period (requested for renewal) |
15 Feb 15 - 14 Feb 22
Other crediting period(s): 15 Feb 08 - 14 Feb 15 |
| Requests for Issuance
and related documentation |
|

project design document
Appendix 1 - ER sheet