Project title of the project activity or programme of activities (PoA) for which issuance is requestedBeijing No.3 Thermal Power Plant Gas-Steam Combined Cycle Project Using Natural Gas (1373)
DOE that requested for issuance and date of requestTÜV NORD (04 Nov 08)
Please indicate, in accordance with paragraphs 65 of the CDM modalities and procedures, for which reason(s) you request review
Incompetence
Please indicate reasons for the request for review
1. The PDD stated that rated capacity of power plant was 400MW and the actual capacity of the installedplant achieved during the full load operation was 406.83MW which is verified by the DOE. However, the configuration diagram of the monitoring report shows 407.69MW of the capacity of the generator. Further clarification is required.
2. The DOE is required to provide further clarification on the application of a weighted average of NCVf,y and arithmetic average of EFCO2,GAS,y for the calculation of the project emission.
3. The DOE stated in the verification report (p 44) that the measured natural gas consumptions provided by the gas supplier are considered decisive because flow meter for natural gas consumption owned by the operator does not meet the applicable accuracy standards. The DOE is required to clarify how it verified the two different emission reductions based on recorded data and invoice data in the monitoring report.
Date 24 Nov 08