01:29 02 Jun 26
Issuance Request for Review Form
|
CDM project activity/programme of activities issuance request review form (CDM-ISSR-FORM) (Version 03.0) |
|---|
| Project title of the project activity or programme of activities (PoA) for which issuance is requested | Waste gases utilisation for Combined Cycle Power Plant in Handan Iron & Steel Group Co., Ltd (1262) |
|---|---|
| DOE that requested for issuance and date of request | TÜV NORD (29 Aug 08) |
| Please indicate, in accordance with paragraphs 65 of the CDM modalities and procedures, for which reason(s) you request review | |
| Incompetence | |
| Please indicate reasons for the request for review | |
|
1.Clarification is required on the causes of 'some inconsistency was found in the reported data source and section D of monitoring report'(p.18, verification report) and what systematic measures have been taken to avoid this in the subsequent monitoring periods. 2. The DOE shall confirm whether the project is interconnected with steam or heat sources other than the waste gases. 3. Clarification is required on how the DOE verified: 3.1) the calibration of the energy meters based on the Verification Regulation of Electrical Energy Meters with Electronics (JJG596-1999), as referred to in the monitoring plan, which is not a calibration standard, 3.2) the accuracy of data from the main meters M1 and M2 calibrated by the project entity (p.18 of monitoring report) whilst the monitoring plan requiring this to be done by a 'certified party', 3.3) that accuracy was assured for the data from the energy meters whose calibration certificates were pending. |
|
| Date | 18 Sep 08 |

Offset now: visit the United Nations Carbon Offset Platform
Connect with us: