Issuance Request for Review Form


CDM project activity/programme of activities
issuance request review form (CDM-ISSR-FORM)
(Version 03.0)

Project title of the project activity or programme of activities (PoA) for which issuance is requestedWaste gases utilisation for Combined Cycle Power Plant in Handan Iron & Steel Group Co., Ltd (1262)
DOE that requested for issuance and date of requestTÜV NORD (29 Aug 08)
Please indicate, in accordance with paragraphs 65 of the CDM modalities and procedures, for which reason(s) you request review
Incompetence
Please indicate reasons for the request for review
1.Clarification is required on the causes of 'some inconsistency was found in the reported data source and
section D of monitoring report'(p.18, verification report) and what systematic measures have been taken to
avoid this in the subsequent monitoring periods.
2. The DOE shall confirm whether the project is interconnected with steam or heat sources other than the
waste gases.
3. Clarification is required on how the DOE verified: 3.1) the calibration of the energy meters based on
the Verification Regulation of Electrical Energy Meters with Electronics (JJG596-1999), as referred to in
the monitoring plan, which is not a calibration standard, 3.2) the accuracy of data from the main meters
M1 and M2 calibrated by the project entity (p.18 of monitoring report) whilst the monitoring plan
requiring this to be done by a 'certified party', 3.3) that accuracy was assured for the data from the energy
meters whose calibration certificates were pending.
Date 18 Sep 08