Issuance Request for Review Form


CDM project activity/programme of activities
issuance request review form (CDM-ISSR-FORM)
(Version 03.0)

Project title of the project activity or programme of activities (PoA) for which issuance is requestedPower capacity expansion project at Dwarikesh Puram (1257)
DOE that requested for issuance and date of requestSGS (11 Nov 10)
Please indicate, in accordance with paragraphs 65 of the CDM modalities and procedures, for which reason(s) you request review
Incompetence
Please indicate reasons for the request for review
1. The revised monitoring plan approved by CDM EB requires cross check of biomass quantity
(BFk,y) with energy balance on the basis of steam quality and quantity generated. However, the
project participant used another approach which involves manufacturerís data on steam-fuel ratio
and steam quantity. The DOE is requested to clarify how it has verified the energy balance as
required by the monitoring plan for cross check of the biomass quantity.
2. The formula used to determine the parameter EGy (Net quantity of increased electricity generation
as a result of the project activity) is not as per applied methodology and the registered PDD. The
DOE is requested to provide clarification on how it has verified the calculation of baseline
emissions in accordance with the registered PDD and applied methodology.
3. The applied methodology requires the parameter EGhistoric to be calculated based on 3 years
historical electricity generation in all power plants. However, the project participant calculated this
parameter based on 1 year historical electricity generation. The DOE is requested to provide a
clarification on how it has verified the calculation of baseline emissions in accordance with the
applied methodology.
Date 15 Dec 10