Issuance Request for Review Form


CDM project activity/programme of activities
issuance request review form (CDM-ISSR-FORM)
(Version 03.0)

Project title of the project activity or programme of activities (PoA) for which issuance is requestedPalmas del Espino – Biogas recovery and heat generation from Palm Oil Mill Effluent (POME) ponds, Peru (1249)
DOE that requested for issuance and date of requestTÜV SÜD (13 Jan 10)
Please indicate, in accordance with paragraphs 65 of the CDM modalities and procedures, for which reason(s) you request review
Incompetence
Please indicate reasons for the request for review
The DOE raised CL4 regarding the difference between the total biogas flow and the sum of the biogas sent
to the boilers and to the flare and closed CL4 by correcting the measured values based on the
manufacture's letter on the possible errors. However, the PP/DOE did not report the total amount of
biogas which is required by the revised monitoring plan and the DOE did not crosscheck the sum of the
corrected biogas flows with the total biogas flow. Further clarification is required as to
1) how the DOE verified the amount of biogas used for the emission reduction as per para 204 (a) of
VVM; and 2) why the PP/DOE did not report the parameter ID11 (total biogas flow).
Date 21 Apr 10