07:56 05 Feb 25
Issuance Request for Review Form
CDM project activity/programme of activities issuance request review form (CDM-ISSR-FORM) (Version 03.0) |
---|
Project title of the project activity or programme of activities (PoA) for which issuance is requested | Palmas del Espino – Biogas recovery and heat generation from Palm Oil Mill Effluent (POME) ponds, Peru (1249) |
---|---|
DOE that requested for issuance and date of request | TÜV SÜD (13 Jan 10) |
Please indicate, in accordance with paragraphs 65 of the CDM modalities and procedures, for which reason(s) you request review | |
Incompetence | |
Please indicate reasons for the request for review | |
The DOE raised CL4 regarding the difference between the total biogas flow and the sum of the biogas sent to the boilers and to the flare and closed CL4 by correcting the measured values based on the manufacture's letter on the possible errors. However, the PP/DOE did not report the total amount of biogas which is required by the revised monitoring plan and the DOE did not crosscheck the sum of the corrected biogas flows with the total biogas flow. Further clarification is required as to 1) how the DOE verified the amount of biogas used for the emission reduction as per para 204 (a) of VVM; and 2) why the PP/DOE did not report the parameter ID11 (total biogas flow). |
|
Date | 16 Apr 10 |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: