Issuance Request for Review Form


CDM project activity/programme of activities
issuance request review form (CDM-ISSR-FORM)
(Version 03.0)

Project title of the project activity or programme of activities (PoA) for which issuance is requestedCiudad Juarez Landfill Gas to Energy Project (1123)
DOE that requested for issuance and date of requestICONTEC (25 Apr 18)
Please indicate, in accordance with paragraphs 65 of the CDM modalities and procedures, for which reason(s) you request review
Incompetence
Please indicate reasons for the request for review
1) As shown in the tab sheets "Simplified MDelec 201605" to "Simplified MDelec 201705", the mass flow rate of methane sent to the power plant (FCH4,EL,y) is calculated by multiplying the parameter “Amount of LFG combusted in power plant (normalized)” (LFGelectricity) with “Methane density in the gaseous stream” and “Methane fraction in the Landfill Gas”. However, it is observed that the calculation considers the parameter LFGelectricity in STP (unit in Nm3, as indicated in columns I) while the density of the methane is determined in operational conditions (unit in tCH4/m3, as indicated in columns J). The DOE is required to explain how it has verified that the calculation of ERs in the Excel spreadsheet is correct since the calculation is not made on the same basis (i.e. STP or operational conditions). Please refer to VVS-PA version 1.0, paragraphs 376 (c) and (d).
Date 08 Aug 18