Project: 1005 Gansu Diebu Niaojiaga 12.9 MW Hydropower Station Project - Crediting Period Renewal Request
[]
Project 1005: Gansu Diebu Niaojiaga 12.9 MW Hydropower Station Project

- project design document (2222 KB)

PDD appendices
Appendix 1 - 1005_Niaojiaga_ER Sheet.xls (88 KB)

- crediting period renewal form (31 KB)
Methodologies Used AMS-I.D. ver. 17 - Grid connected renewable electricity generation
VVS Version
Standardized baselines used N/A
Amount of Reductions 41,616 metric tonnes CO2 equivalent per annum
Validation Opinion Validation opinion (918 KB)
Renewal Date 28 Feb 14 (Renewable - Expired)   (view history)  
Renewal no longer possible
Crediting Period (requested for renewal) 14 May 14 - 13 May 21

Other crediting period(s): 14 May 07 - 13 May 14
Requests for Issuance
and related documentation