21:49 27 Oct 25
Project:
0823 Huadian Inner Mongolia Huitengxile 100.25MW Wind Farm Project
- Crediting Period Renewal Request
[]
| Project |
0823: Huadian Inner Mongolia Huitengxile 100.25MW Wind Farm Project
- project design document (750 KB)
PDD appendices Appendix 1 - EF&ER calculation_Huadian Inner Mongolia Huitengxile 100.25MW Wind Farm Project.xlsx (36 KB)
- crediting period renewal form (41 KB)
|
|---|---|
| Methodologies Used |
ACM0002 ver. 13 -
Consolidated baseline methodology for grid-connected electricity generation from renewable sources
|
| VVS Version | |
| Standardized baselines used | N/A |
| Amount of Reductions | 239,510 metric tonnes CO2 equivalent per annum |
| Validation Opinion |
Validation opinion (685 KB)
|
| Renewal Date |
28 Feb 14
(Renewable - Expired)
(view history)
Renewal no longer possible
|
| Crediting Period (requested for renewal) |
29 Mar 14 - 28 Mar 21
Other crediting period(s): 29 Mar 07 - 28 Mar 14 |
| Requests for Issuance
and related documentation |
|

project design document
Appendix 1 - EF&ER calculation_Huadian Inner Mongolia Huitengxile 100.25MW Wind Farm Project.xlsx
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: