Project: 0823 Huadian Inner Mongolia Huitengxile 100.25MW Wind Farm Project - Crediting Period Renewal Request
[]
Project 0823: Huadian Inner Mongolia Huitengxile 100.25MW Wind Farm Project

- project design document (750 KB)

PDD appendices
Appendix 1 - EF&ER calculation_Huadian Inner Mongolia Huitengxile 100.25MW Wind Farm Project.xlsx (36 KB)

- crediting period renewal form (41 KB)
Methodologies Used ACM0002 ver. 13 - Consolidated baseline methodology for grid-connected electricity generation from renewable sources
VVS Version
Standardized baselines used N/A
Amount of Reductions 239,510 metric tonnes CO2 equivalent per annum
Validation Opinion Validation opinion (685 KB)
Renewal Date 28 Feb 14 (Renewable - Expired)   (view history)  
Renewal no longer possible
Crediting Period (requested for renewal) 29 Mar 14 - 28 Mar 21

Other crediting period(s): 29 Mar 07 - 28 Mar 14
Requests for Issuance
and related documentation