Project: 0810 Bagasse based Cogeneration Plant at Seohara, Uttar Pradesh. - History
Project 0810: Bagasse based Cogeneration Plant at Seohara, Uttar Pradesh.

Data before acceptance of changes in PDD on 01 Feb 2011

CDM-PDD project design document (530 KB)


PDD appendices
Appendix 1 - Enclosure 1 (113 KB)
Appendix 2 - Enclosure 2 (1350 KB)
Appendix 3 - Cediting Period Letter (322 KB)