Project: 0554 Luertai 12.2 MW Hydropower Station Project, Lintan County, Gannan Autonomous Tibetan Prefecture, Gansu province, China - Issuance Request
Project 0554: Luertai 12.2 MW Hydropower Station Project, Lintan County, Gannan Autonomous Tibetan Prefecture, Gansu province, China
 
ISSUANCE STATUS Issued (on 13 May 11)  
Monitoring period 01 Jun 08 - 29 Mar 10
Monitoring report Monitoring report (248 KB)
 
Request for issuance Signed form (2136 KB)
Amount of CERs CERs issued up to 31 December 2012: 54,425
Serial Range: Block start: CN-5-348341227-1-1-0-554     Block end: CN-5-348395651-1-1-0-554
Verification and certification reports Certification report (1001 KB)
Verification report (1184 KB)
Additional documents (4) Calibration record of main meter M0_Luertai HP (189 KB)
(5) Calibration record of auxiliary meters M1,M2_Luertai HP (178 KB)
(6) Monitoring Report_Luertai HP_Ver.2.0 (253 KB)
(7) Monthly Sales Report_Luertai HP (707 KB)
(8) Statement on Power Imported from Grid_Luertai HP (136 KB)
(9) Calculation spreadsheet_Luertai HP (38 KB)
(16) Statement on calibration and on-site inspection to the electric energy meter_Luertai HP (434 KB)