04:16 05 Oct 24
Project:
0554 Luertai 12.2 MW Hydropower Station Project, Lintan County, Gannan Autonomous Tibetan Prefecture, Gansu province, China
- Crediting Period Renewal Request
[]
Project |
0554: Luertai 12.2 MW Hydropower Station Project, Lintan County, Gannan Autonomous Tibetan Prefecture, Gansu province, China
- project design document (838 KB) PDD appendices Appendix 1 - ER calculation spreadsheet_Luertai 12.2MW Hydropower Station Project.xls (79 KB) - crediting period renewal form (37 KB) |
---|---|
Methodologies Used |
AMS-I.D. ver. 17 -
Grid connected renewable electricity generation
|
VVS Version | |
Standardized baselines used | N/A |
Amount of Reductions | 37,191 metric tonnes CO2 equivalent per annum |
Validation Opinion | Validation opinion (561 KB) |
Renewal Date |
13 Mar 14
(Renewable - Expired)
(view history)
Renewal no longer possible
|
Crediting Period (requested for renewal) |
30 Sep 13 - 29 Sep 20
Other crediting period(s): 30 Sep 06 - 29 Sep 13 |
Requests for Issuance
and related documentation |
Monitoring report: 30 Sep 2013 - 29 Sep 2020 (475 KB) Issuance request state: Issued CERs requested from 01 Jan 2013 until 31 December 2020: 205057 Serial Range: Block start: CN-5-1180301975-2-2-0-554 Block end: CN-5-1180507031-2-2-0-554 [Full view and history] |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: