Project: 0554 Luertai 12.2 MW Hydropower Station Project, Lintan County, Gannan Autonomous Tibetan Prefecture, Gansu province, China - Crediting Period Renewal Request
[]
Project 0554: Luertai 12.2 MW Hydropower Station Project, Lintan County, Gannan Autonomous Tibetan Prefecture, Gansu province, China

- project design document (838 KB)

PDD appendices
Appendix 1 - ER calculation spreadsheet_Luertai 12.2MW Hydropower Station Project.xls (79 KB)

- crediting period renewal form (37 KB)
Methodologies Used AMS-I.D. ver. 17 - Grid connected renewable electricity generation
VVS Version
Standardized baselines used N/A
Amount of Reductions 37,191 metric tonnes CO2 equivalent per annum
Validation Opinion Validation opinion (561 KB)
Renewal Date 13 Mar 14 (Renewable - Expired)   (view history)  
Renewal no longer possible
Crediting Period (requested for renewal) 30 Sep 13 - 29 Sep 20

Other crediting period(s): 30 Sep 06 - 29 Sep 13
Requests for Issuance
and related documentation

Monitoring report: 30 Sep 2013 - 29 Sep 2020 (475 KB)
Issuance request state: Issued
CERs requested from 01 Jan 2013 until 31 December 2020: 205057
Serial Range: Block start: CN-5-1180301975-2-2-0-554      Block end: CN-5-1180507031-2-2-0-554
[Full view and history]