01:29 12 Dec 24
Issuance Request for Review Form
CDM project activity/programme of activities issuance request review form (CDM-ISSR-FORM) (Version 03.0) |
---|
Project title of the project activity or programme of activities (PoA) for which issuance is requested | Catalytic N2O destruction project in the tail gas of the Nitric Acid Plant of Abu Qir Fertilizer Co. (0490) |
---|---|
DOE that requested for issuance and date of request | DNV (18 Jul 08) |
Please indicate, in accordance with paragraphs 65 of the CDM modalities and procedures, for which reason(s) you request review | |
Incompetence | |
Please indicate reasons for the request for review | |
OTHER ISSUES:
1. The PP is required to provide daily plant output of HNO3, actual operating temperature of ammonia oxidation reactors, actual operating pressure of the ammonia oxidation reactors, and actual ammonia flow rate to the ammonia oxidation reactor in the monitoring report at the intervals required by the registered monitoring plan and the approved methodology. 2. The applied methodology requires regular calibration of the tail gas flow meter, and the natural gas flow meter. Further clarification is required on how the DOE verified the calibration of these equipments as this information is missing in the verification report. 3. The monitoring report (p.7) stated that “the starting date of the second crediting period is defined as January 1 2007. ” Further clarification is required. |
|
Date | 21 Aug 08 |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: