07:08 22 Feb 25
Issuance Request for Review Form
CDM project activity/programme of activities issuance request review form (CDM-ISSR-FORM) (Version 03.0) |
---|
Project title of the project activity or programme of activities (PoA) for which issuance is requested | AWMS GHG Mitigation Project BR05-B-12, Mato Grosso, Mato Grosso do Sul, Minas Gerais, and Sao Paulo, Brazil (0472) |
---|---|
DOE that requested for issuance and date of request | DNV (14 Jan 12) |
Please indicate, in accordance with paragraphs 65 of the CDM modalities and procedures, for which reason(s) you request review | |
Incompetence | |
Please indicate reasons for the request for review | |
1) The DOE shall further clarify if the accuracy of the instruments used to monitor the volume of biogas and the methane content of the biogas are as per the requirements of the revised monitoring plan approved on 24 November 2008, in line with the VVM version 01.2 paragraph 205(c). In doing so, the DOE should consider that the revised monitoring plan Section D.4. states that: (1) the "Accuracy of the flow meters utilized exceeds 99 percent across the entire measured rate curve with an uncertainty range of less than + 1 percent" and; (2) regarding the methane gas analyzer, "The equipment and test procedures will provide an accuracy with a + 0.5 percent uncertainty range". Please refer to VVM version 01.2 paragraph 205(c). | |
Date | 24 Mar 12 |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: