Issuance Request for Review Form


CDM project activity/programme of activities
issuance request review form (CDM-ISSR-FORM)
(Version 03.0)

Project title of the project activity or programme of activities (PoA) for which issuance is requestedAWMS GHG Mitigation Project BR05-B-07, Mato Grosso, Minas Gerais and Goiás, Brazil. (0337)
DOE that requested for issuance and date of requestDNV (21 Aug 09)
Please indicate, in accordance with paragraphs 65 of the CDM modalities and procedures, for which reason(s) you request review
Incompetence
Please indicate reasons for the request for review
The PP/DOE are requested to clarify the list of electricity consumption equipments of all the sites, since the verification report (p.9) states that only "For a sample of sites, the list of equipment considered in the calculation was cross-checked with the equipment installed at the site…..."

OTHER ISSUES:
The DOE states that the portable gas analyser is being sent annually for manufacturer calibration (p.8 of verification report) while the PP indicates that the frequency of manufacturer recalibration is every 6 months (p.13 of monitoring report). Clarification is required.
Date 23 Nov 09