Project: 0281 4.5 MW Biomass (Agricultural Residue) Based Power Generation Unit of M/s Matrix Power Pvt. Ltd. (MPPL) - Crediting Period Renewal Request
[]
Project 0281: 4.5 MW Biomass (Agricultural Residue) Based Power Generation Unit of M/s Matrix Power Pvt. Ltd. (MPPL)

- project design document (601 KB)

PDD appendices
Appendix 1 - CER calculations (39 KB)

- crediting period renewal form (29 KB)
Methodologies Used AMS-I.D. ver. 13 - Grid connected renewable electricity generation
VVS Version
Standardized baselines used N/A
Amount of Reductions 22,299 metric tonnes CO2 equivalent per annum
Validation Opinion Validation opinion (1069 KB)
Renewal Date 08 Dec 08 (Renewable - Expired)   (view history)  
Renewal no longer possible
Crediting Period (requested for renewal) 15 Aug 08 - 14 Aug 15

Other crediting period(s): 15 Aug 01 - 14 Aug 08
Requests for Issuance
and related documentation

Monitoring report: 15 Aug 2008 - 21 Sep 2009 (171 KB)
Issuance request state: Issued
CERs requested up to 31 December 2012: 21728
Serial Range: Block start: IN-5-78904006-1-1-0-281      Block end: IN-5-78925733-1-1-0-281
[Full view and history]



Monitoring report: 22 Sep 2009 - 21 Sep 2010 (303 KB)
Issuance request state: Issued
CERs requested up to 31 December 2012: 20261
Serial Range: Block start: IN-5-88027642-1-1-0-281      Block end: IN-5-88047902-1-1-0-281
[Full view and history]



Monitoring report: 22 Sep 2010 - 21 Sep 2011 (309 KB)
Issuance request state: Issued
CERs requested up to 31 December 2012: 19722
Serial Range: Block start: IN-5-137241601-1-1-0-281      Block end: IN-5-137261322-1-1-0-281
[Full view and history]