Project 10294 : Los Laureles Hydroelectric Project
Project title Los Laureles Hydroelectric Project
- project design document (3002 KB)

PDD appendices
Appendix 1 - LosLaureles_EF & ER's v2_150615 (191 KB)
Appendix 2 - FA Ver. 2, 06_10_16 Los Laureles Hydroelectric Project (319 KB)
Appendix 3 - Incomplete response Los Laureles (177 KB)
Appendix 4 - Incomplete 2nd Response_Los Laureles25.10.2016 (383 KB)
Appendix 5 - Los laureles FVR23102016_v5_track (1258 KB)


- registration request form (114 KB)
SDC description report Co-benefits report

Report(s):
20180608_SDTOOL03_10294_ver1.pdf (93 KB)

Host Parties Honduras , involved indirectly approval (263 KB) authorization (263 KB)
Authorized Participants: Generación Renovable y Ambiental S.A. de C.V.
Other Parties Involved n/a
Sectoral scopes 1 : Energy industries (renewable - / non-renewable sources)
Activity Scale SMALL
Methodologies Used AMS-I.D. ver. 18 - Grid connected renewable electricity generation
Standardized baselines used N/A
Amount of Reductions 20,188 metric tonnes CO2 equivalent per annum
Fee level USD 2537.6
Validation Report VVS/VVM version: VVS 9.0
Validation report (933 KB) Public availability information
Link to information uploaded for public availability
Modalities of Communication
MoC Annex 1
Modalities of Communication valid as of 29/12/2023
Registration Date 27 Apr 16   (view history)   info & rep check: concluded
Crediting Period 01 Sep 16 - 31 Aug 23 (Renewable - Expired)
Renewal no longer possible
Status of a registered
project activity report
The project activity or PoA has been implemented, but the project participants or the coordinating/managing entity have not yet decided to proceed with the request for issuance stage
Requests for Issuance
and related documentation