05:28 07 Nov 25
Project
9051 :
“Tucuruí-Macapá-Manaus Electrical Interconnected grid” (for simplicity hereafter referred to simply as the “LT-Amazonas Project”).
| Project title |
“Tucuruí-Macapá-Manaus Electrical Interconnected grid” (for simplicity hereafter referred to simply as the “LT-Amazonas Project”).
- project design document (1074 KB)
PDD appendices Appendix 1 - ER Sheet_LT Amazonas (2009 KB) Appendix 2 - IRR_LT Amazonas (682 KB)
- registration request form (124 KB)
|
|---|---|
| SDC description report | Not Available. Please refer to our Further Information on SD-Tool |
| Host Parties |
Brazil
, involved indirectly
approval (233 KB)
authorization (233 KB)
Authorized Participants: Linhas de Xingu Transmissora de Energia S.A. (LXTE) ; Linhas de Macapá Transmissora de Energia S.A. (LMTE) ; Manaus Transmissora de Energia S.A. (MTE) ; Ecopart Assessoria em Negócios Empresariais Ltda. ; Zeroemissions do Brasil Ltda. |
| Other Parties Involved | n/a |
| Sectoral scopes | 1 : Energy industries (renewable - / non-renewable sources) |
| Activity Scale | LARGE |
| Methodologies Used |
AM0104 -
Interconnection of electricity grids in countries with economic merit order dispatch
|
| Standardized baselines used | N/A |
| Amount of Reductions | 2,008,821 metric tonnes CO2 equivalent per annum |
| Fee level | USD 350000.0 |
| Validation Report |
VVS/VVM version:
VVS 2.0
Validation report (1173 KB)
Public availability information
Link to information uploaded for public availability |
| Modalities of Communication | |
| Registration Date | Rejected (view history) completeness check: complete info & rep check: concluded |
| Crediting Period | 01 Jan 13 - 31 Dec 22 (Fixed) |

project design document
Appendix 2 - IRR_LT Amazonas
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: