Project 8449 : Solar Farm at Phitsanulok, Thailand
Project title Solar Farm at Phitsanulok, Thailand
- project design document (1222 KB)

PDD appendices
Appendix 1 - Benchmark_Phitsanulok (699 KB)
Appendix 2 - ER Calculation_Phitsanulok (126 KB)
Appendix 3 - Investment Analysis_Phitsanulok (170 KB)


- registration request form (468 KB)
SDC description report Not Available. Please refer to our Further Information on SD-Tool
Host Parties Thailand , involved indirectly approval (647 KB) authorization (647 KB)
Authorized Participants: Energy Absolute Public Co., Ltd.
Other Parties Involved n/a
Sectoral scopes 1 : Energy industries (renewable - / non-renewable sources)
Activity Scale LARGE
Methodologies Used ACM0002 ver. 12 - Consolidated baseline methodology for grid-connected electricity generation from renewable sources
Standardized baselines used N/A
Amount of Reductions 78,543 metric tonnes CO2 equivalent per annum
Fee level USD 14208.6
Validation Report VVS/VVM version: VVM 1.2
Validation report (2065 KB) Public availability information
Link to information uploaded for public availability
Modalities of Communication
MoC Annex 1
Modalities of Communication valid as of 21/06/2013
Registration Date 11 Dec 12 (Date of registration action 21 Feb 13)   (view history)   completeness check: complete info & rep check: concluded
Crediting Period 01 Dec 15 - 30 Nov 22 (Renewable - Expired)
Renewal no longer possible
Status of a registered
project activity report
The project activity or PoA has been implemented, but the project participants or the coordinating/managing entity have not yet decided to proceed with the request for issuance stage
Requests for Issuance
and related documentation