13:14 10 Nov 25
Project:
8302 Huaneng Wutai Eling 49.5MW Wind Power Project
- Crediting Period Renewal Request
[]
| Project |
8302: Huaneng Wutai Eling 49.5MW Wind Power Project
- project design document (1226 KB)
PDD appendices Appendix 1 - Huaneng Wutai Eling 49.5MW Wind Power Project (8302)_ER sheet v6.1 (18 KB)
- crediting period renewal form (111 KB)
|
|---|---|
| Methodologies Used |
ACM0002 ver. 20 -
Grid-connected electricity generation from renewable sources
|
| VVS Version | VVS-PA 2.0 |
| Standardized baselines used | N/A |
| Amount of Reductions | 84,208 metric tonnes CO2 equivalent per annum |
| Validation Opinion |
Validation opinion (388 KB)
|
| Renewal Date | 21 Jan 21 (Renewable) (view history) completeness check info & rep check: concluded |
| Crediting Period (requested for renewal) |
27 Dec 19 - 26 Dec 26
Other crediting period(s): 27 Dec 12 - 26 Dec 19 |
| Requests for Issuance
and related documentation |
|

project design document
Appendix 1 - Huaneng Wutai Eling 49.5MW Wind Power Project (8302)_ER sheet v6.1
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: