22:11 08 Nov 26
Project
5830 :
Jilin Tumen Mopanshan 16 MW Hydro Power Project
| Project title |
Jilin Tumen Mopanshan 16 MW Hydro Power Project
- project design document (847 KB)
PDD appendices Appendix 1 - Starting Date_Jilin Tumen (1028 KB)
Appendix 2 - Prior CDM Consideration_Jilin Tumen (1011 KB)
Appendix 3 - ER Calculation_Jilin Tumen (69 KB)
Appendix 4 - Investment Analysis_Jilin Tumen (91 KB)
- registration request form (621 KB)
|
|---|---|
| SDC description report | Not Available. Please refer to our Further Information on SD-Tool |
| Host Parties |
China
, involved indirectly
approval (282 KB)
authorization (282 KB)
Authorized Participants: GD Power Mopanshan Branch Company |
| Other Parties Involved |
United Kingdom of Great Britain and Northern Ireland
, involved indirectly
approval (82 KB)
authorization (82 KB)
Authorized Participants: Standard Bank Plc (withdrawn as of 11/05/2020) |
| Sectoral scopes | 1 : Energy industries (renewable - / non-renewable sources) |
| Activity Scale | LARGE |
| Methodologies Used |
ACM0002 ver. 12 -
Consolidated baseline methodology for grid-connected electricity generation from renewable sources
|
| Standardized baselines used | N/A |
| Amount of Reductions | 50,137 metric tonnes CO2 equivalent per annum |
| Fee level | USD 8527.4 |
| Validation Report |
Validation report (544 KB)
Public availability information
Link to information uploaded for public availability |
| Modalities of Communication |
MoC Annex 1 Modalities of Communication valid as of 17/07/2012 MoC Annex 3 (Withdraw Focal Point) valid as of 20/07/2020 MoC Annex 2 (Withdraw Project Participant (Voluntary)) valid as of 11/05/2020 MoC Annex 2 (Change/update authorized signatory, name or contact details) valid as of 26/04/2013 |
| Registration Date | 26 Apr 12 (Date of registration action 13 Jul 12) (view history) completeness check: complete info & rep check: concluded |
| Crediting Period |
26 Apr 12 - 25 Apr 19
(Renewable - Expired)
Renewal no longer possible
|
| Requests for Issuance
and related documentation |
|

project design document
Appendix 3 - ER Calculation_Jilin Tumen
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: