11:31 04 Nov 26
Project
5795 :
Kapiura POME methane capture project
| Project title |
Kapiura POME methane capture project
- project design document (1699 KB)
PDD appendices Appendix 1 - ER Calculation_Kapiura (402 KB)
- registration request form (616 KB)
|
|---|---|
| SDC description report | Not Available. Please refer to our Further Information on SD-Tool |
| Host Parties |
Papua New Guinea
, involved indirectly
approval (525 KB)
authorization (525 KB)
Authorized Participants: New Britain Palm Oil Limited (NBPOL) ; Carbon Bridge Pte Ltd |
| Other Parties Involved | n/a |
| Sectoral scopes |
1 : Energy industries (renewable - / non-renewable sources)
13 : Waste handling and disposal |
| Activity Scale | SMALL |
| Methodologies Used |
AMS-III.H. ver. 16 -
Methane recovery in wastewater treatment
AMS-I.D. ver. 17 - Grid connected renewable electricity generation AMS-I.A. ver. 14 - Electricity generation by the user |
| Standardized baselines used | N/A |
| Amount of Reductions | 63,801 metric tonnes CO2 equivalent per annum |
| Fee level | USD 11260.2 (deferred) |
| Validation Report |
Validation report (1208 KB)
Public availability information
Link to information uploaded for public availability |
| Modalities of Communication |
MoC Annex 1 Modalities of Communication valid as of 08/08/2012 |
| Registration Date | 05 Jun 12 (Date of registration action 07 Aug 12) (view history) completeness check: complete info & rep check: concluded |
| Crediting Period |
01 Jan 13 - 31 Dec 19
(Renewable - Expired)
Renewal no longer possible
|
| Requests for Issuance
and related documentation |
|

project design document
Appendix 1 - ER Calculation_Kapiura
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: