08:49 07 Nov 25
Project:
5282 Diqing Prefecture Niru River Muxingtu Hydropower Station Project
- Crediting Period Renewal Request
[]
| Project |
5282: Diqing Prefecture Niru River Muxingtu Hydropower Station Project
- project design document (528 KB)
PDD appendices Appendix 1 - Untitled (uploaded 13 Jun 19 12:55:32) (30 KB)
- crediting period renewal form (46 KB)
|
|---|---|
| Methodologies Used |
ACM0002 ver. 19 -
Grid-connected electricity generation from renewable sources
|
| VVS Version | VVS-PA 2.0 |
| Standardized baselines used | N/A |
| Amount of Reductions | 204,044 metric tonnes CO2 equivalent per annum |
| Validation Opinion |
Validation opinion (192 KB)
|
| Renewal Date | 02 Nov 19 (Renewable) (view history) completeness check info & rep check: concluded |
| Crediting Period (requested for renewal) |
01 Dec 18 - 30 Nov 25
Other crediting period(s): 01 Dec 11 - 30 Nov 18 |
| Requests for Issuance
and related documentation |
|

project design document
Appendix 1 - Untitled (uploaded 13 Jun 19 12:55:32)
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: