Project: 5282 Diqing Prefecture Niru River Muxingtu Hydropower Station Project - Crediting Period Renewal Request
[]
Project 5282: Diqing Prefecture Niru River Muxingtu Hydropower Station Project

- project design document (528 KB)

PDD appendices
Appendix 1 - Untitled (uploaded 13 Jun 19 12:55:32) (30 KB)

- crediting period renewal form (46 KB)
Methodologies Used ACM0002 ver. 19 - Grid-connected electricity generation from renewable sources
VVS Version VVS-PA 2.0
Standardized baselines used N/A
Amount of Reductions 204,044 metric tonnes CO2 equivalent per annum
Validation Opinion Validation opinion (192 KB)
Renewal Date 02 Nov 19 (Renewable)   (view history)   completeness check info & rep check: concluded
Crediting Period (requested for renewal) 01 Dec 18 - 30 Nov 25

Other crediting period(s): 01 Dec 11 - 30 Nov 18
Requests for Issuance
and related documentation