Registration Request for Review Form
CDM project activity/programme of activities registration request review form (CDM-REGR-FORM) (Version 03.0) |
---|
Reference number of the proposed CDM project activity/programme of activities (PoA) submitted for registration | 4629 |
---|---|
Title of the proposed CDM project activity/PoA submitted for registration | Greenhouse Gas Emission Reductions Through Super Critical Technology - Jharkhand Integrated Power Ltd. |
Please indicate, in accordance with paragraphs 37 and 40 of the CDM modalities and procedures, which validation requirement(s) may require review. A list of requirements is provided below. Please provide reasons in support of the request for review. Including any supporting documentation. | |
The following are requirements derived from paragraph 37 of the CDM modalities and procedures: | |
![]() ![]() ![]() ![]() ![]() ![]() ![]() |
|
The following are requirements derived from paragraph 40 of the CDM modalities and procedures: | |
![]() ![]() ![]() ![]() ![]() ![]() |
|
![]() |
|
Additional information | |
1. The DOE shall further justify the suitability of the 13.25% benchmark, validated against prime lending rate for India in year 2008. In doing so please refer to VVM, version 1.2, paragraphs 112, a, b, c. 2. The DOE shall further validate the annual 6.39% escalation in fuel cost and secondary fuel cost as per VVM, version 1.2, paragraph 111. 3. The DOE shall further validate the electricity tariff as the four components (Non-Escalable Capacity Charge, Escalable Capacity Charge, Non-Escalable Energy Charge, and Escalable Energy Charge) of this tariff used in the IRR calculations are neither explained nor justified. In doing so, please refer to VVM version 1.2. paragraph 111. 4. The DOE shall clarify whether the applied tariff considers the CDM revenue or not as: (a) a request for qualification for tariff based bidding was sent in February 2007 (P20, VR, p11) before the prior consideration of the CDM which was based when the company Board decided to bid for the project, October and December 2008 (VR, p36-37), and (b) a letter of acceptance of the bid was provided in August 2009 (footnote 7, VR, p36). In doing so, please provide: (a) a detail timeline of the PP’s actions for the biding process and for the CDM; and (b) refer to VVM, version 1.2, paragraph 104. 5. The DOE shall provide a sensitivity analysis of the tariff as this is a key parameter to the IRR calculation. In doing so, please refer to VVM, version 1.2, paragraph 111.e. |
|
Date | 17 Jun 11 |