Issuance Request for Review Form


CDM project activity/programme of activities
issuance request review form (CDM-ISSR-FORM)
(Version 03.0)

Project title of the project activity or programme of activities (PoA) for which issuance is requestedSungei Kahang POME Biogas Recovery for Energy Project in Johor, Malaysia. (3686)
DOE that requested for issuance and date of requestTÜV NORD (13 Aug 12)
Please indicate, in accordance with paragraphs 65 of the CDM modalities and procedures, for which reason(s) you request review
Incompetence
Please indicate reasons for the request for review
1) Regarding the calculation of baseline emission for the electricity consumed in the absence of the project activity, the DOE has reported that the grid emission factor applied is 0.684 tCO2/MWh, while the diesel emission factor is 0.8 tCO2/MWh (P.46 of the VR). The DOE is requested to justify why application of the higher diesel emission factor of 0.8 tCO2/MWh to the project activity is considered appropriate, as the methodology (p.16) requires that the lower emission factor between the grid emission factor and the emission factor of the captive power plant should be used as a conservative simplification. Please refer to ACM0014 version 3 page 16.
Date 23 Oct 12